Liberty Development and Production Plan
Ultra Extended Reach Drilling from Endicott
Satellite Drilling Island (SDI)
Environmental Assessment
|
Alaska Outer Continental Shelf Environmental Assessment |
OCS EIS/EA
MMS 2007-054
|
|
|
Section 1 - Project Summary
(29 pages, 2MB) |
|
|
Section 2 - Affected Environment (83 pages, 1.9MB)
|
| |
Section 3 - Environmental Consequences, 3-1 thru 3-47 (48 pages, 4MB) |
| |
Section 3 - Environmental Consequences, 3-48 thru 3-88 (41 pages, 3.3MB) |
| |
Section 4 - Mitigation Measures (18 pages, 1.6MB) |
| |
Section 5 - Consultation and Coordination,
Section 6 - List of Preparers, Section 7. References (50 pages, 3MB) |
| |
|
| |
Tables and Figures |
| |
Tables (49 pages, 1MB) |
| |
Figure 1-1 Study Area Map (1 page, 5.7MB) |
| |
Figure 1-2 Alternatives (1 page, 368KB) |
| |
Figures 2.1-2 thr 2.11-3 (27 pages, 3.4MB) |
| |
Figures 2.13-1 thru 3.4-3 (10 pages, 4.3MB) |
| |
|
| |
Appendices |
| |
Appendices A, B, and C (139 pages, 3.8MB) |
| |
Appendix C - Continued (44 pages, 5MB) |
| |
Appendices D - I (69 pages, 5.2MB) |
| |
|
| |
|
|
|
Complete, Downloadable Copy (614 pages, 27MB)
Link to Liberty DPP |
|